Technical-economic analysis for a metro project by the integration of BIM modelling and construction schedule.
Rel. Anna Osello. Politecnico di Torino, Corso di laurea magistrale in Ingegneria Civile, 2021
|
Preview |
PDF (Tesi_di_laurea)
- Tesi
Licenza: Creative Commons Attribution Non-commercial No Derivatives. Download (5MB) | Preview |
|
|
Archive (ZIP) (Documenti_allegati)
- Altro
Licenza: Creative Commons Attribution Non-commercial No Derivatives. Download (151MB) |
Abstract
An increasing number of construction projects utilizing building information modeling (BIM) have been witnessed in the past years. Research has shown that several countries worldwide started to request or enforce the adoption of BIM methodologies in construction projects especially publicly funded ones. Therefore, BIM implementing firms are now investigating possibilities to expand the use of BIM to cover more aspects of projects. This study is a real-life BIM application on a metro project to be constructed, with the main aim is to practice the BIM methodologies in integrating both 4D (time) and 5D (cost) into the project three-dimensional geo-referenced model. Throughout this article a brief background about BIM was studied.
Then the BIM methodology followed to prepare a reliable 4D/5D model of the underground metro project was addressed