Chiara Bagarin
Schedule Pressure Factor - A correction Factor for estimating the Final Project Duration.
Rel. Filippo Maria Ottaviani. Politecnico di Torino, Corso di laurea magistrale in Ingegneria Gestionale (Engineering And Management), 2026
|
Preview |
PDF (Tesi_di_laurea)
- Tesi
Licenza: Creative Commons Attribution Non-commercial No Derivatives. Download (795kB) | Preview |
Abstract
This thesis analyzes how quantifying schedule pressure using the Schedule Pressure Factor (SPF) can improve the accuracy of estimates of the total estimated remaining time to completion (TEAC) compared to traditional methods of Earned Value Management (EVM) and Earned Schedule (ES). The SPF is formulated as a corrective multiplier for the TEAC_EVM estimate, non-linearly integrating the relative schedule performance index (SPI(t)) and the absolute time deviation normalized relative to the planned duration ((AT - ES)/PD). This work defines the analytical structure of the indicator, develops a procedure for calibrating the sensitivity coefficients (alpha, beta, gamma) based on optimization algorithms (Differential Evolution and L-BFGS-B) and validates its performance on a real-world dataset by comparing both the parameterized and non-parameterized versions.
Relatori
Anno Accademico
Tipo di pubblicazione
Numero di pagine
Corso di laurea
Classe di laurea
Aziende collaboratrici
URI
![]() |
Modifica (riservato agli operatori) |