Jad Kesserwan
Analysis of a Mechanized Excavation Using an EPB TBM The Case of the Grottaminarda Tunnel.
Rel. Daniele Peila, Carmine Todaro, Andrea Carigi. Politecnico di Torino, Master of science program in Civil Engineering, 2025
|
Preview |
PDF (Tesi_di_laurea)
- Thesis
Licence: Creative Commons Attribution Non-commercial No Derivatives. Download (23MB) | Preview |
Abstract
This thesis presents an analysis of the main excavation data regarding the Grottaminarda tunnel, excavated using an EPB-TBM, almost in closed mode and under hyperbaric conditions. Chapter 2 will provide a brief introduction to the geological-geomechanical context of the area, in order to describe the main issues to be addressed throughout the section under investigation. Chapter 3 and Chapter 4 will present the predictive models used by the designers to determine the necessary machine parameters for excavation, and the P.A.T. (TBM Advancement Protocol). The latter is the "guideline" for the various work teams on site, essential for achieving proper progress in terms of pressures, thrust, torque, excavation volumes, and other machine-soil parameters.
Monitoring will then be a central part of Chapter 4, as it is the main feedback and control tool for all phases of the project
Relators
Academic year
Publication type
Number of Pages
Course of studies
Classe di laurea
URI
![]() |
Modify record (reserved for operators) |
