Mohamed Mohamed Ibrahim Elbastawisi
Huge underground caverns design and excavation: interpretation of monitoring data through back-analyses.
Rel. Monica Barbero. Politecnico di Torino, Corso di laurea magistrale in Ingegneria Civile, 2022
|
Preview |
PDF (Tesi_di_laurea)
- Tesi
Licenza: Creative Commons Attribution Non-commercial No Derivatives. Download (26MB) | Preview |
Abstract
Nowadays in conjunction with the tremendous demand for electricity which is the backbone of the new civilization. Humanity searches for renewable and sustainable resources of electric energy and invests a lot of money to find modern solutions. Thus, one of the innovative technologies in the new era is the power pumped-storage hydroelectric plants underground. in addition to that the superb latest technologies not only generate electricity from these hydropower plants but restore the excess energy that already exists on the grid. So, these hydropower plants act as large batteries. Also, these plants have less cost, less environmental harm, no greenhouse gases emission, and their life cycle has around 40-50 years.
The research is a discussion about a hydropower plant that is located 300 meters below the ground surface in the complexity of geological conditions, heterogeneity, and anisotropy of the rock mass
Relatori
Anno Accademico
Tipo di pubblicazione
Numero di pagine
Corso di laurea
Classe di laurea
Aziende collaboratrici
URI
![]() |
Modifica (riservato agli operatori) |
