Nicola Crestani
Tunnel excavation with D&B: the Skottås Tunnel case study.
Rel. Marilena Cardu. Politecnico di Torino, Corso di laurea magistrale in Petroleum And Mining Engineering (Ingegneria Del Petrolio E Mineraria), 2023
Abstract
Drill and blast still features among the most used solutions for tunnelling in medium to hard rock conditions. The main benefits of this method are the versatile equipment, the fast start up and a relatively low capital tied to the equipment. It is a cyclical process that requires a proper work site organization. The aim of this work is to describe the application of D&B method for the excavation of Skottås Tunnel, in the southwest of Norway. Particular attention has been given to two specific activities, grouting injection before excavation and overbreak remedy actions before the final lining phases. The first one, also due to the geological conditions of Scandinavia, is a widely spread solution in Norway.
The purpose of pre – grouting activity will be highlighted and what are the effects of this activity on the working area, but also on the rock mass that is going to be excavated
Relatori
Anno Accademico
Tipo di pubblicazione
Numero di pagine
Informazioni aggiuntive
Corso di laurea
Classe di laurea
Aziende collaboratrici
URI
![]() |
Modifica (riservato agli operatori) |