Ikram Hussain
BIM methodology the case study of FCA Mirafiori.
Rel. Anna Osello, Davide Lorenzo Dino Aschieri. Politecnico di Torino, Corso di laurea magistrale in Ingegneria Civile, 2022
|
PDF (Tesi_di_laurea)
- Tesi
Licenza: Creative Commons Attribution Non-commercial No Derivatives. Download (7MB) | Preview |
Abstract: |
The objective of this Thesis is to define a BIM methodology for the design and construction of university campus of Politecnico Di Torino in an existing steel structure of FCA (Fiat Chrysler Automobile) warehouse which is part of Fiat Mirafiori industrial area in the south of Torino. FCA was a warehouse of Fiat Mirafiori which is currently unfunctional so in this thesis we will propose an architectural design to convert the warehouse into university campus. Moreover, the research carried out for this thesis aims to study the applicability of the BIM methodology in Construction Management discipline, for the construction of the building all design phases will be performed in a real case scenario, but the focus will be the architectural design. For this planning phase of the building construction, the works were divided and performed in the following way. -??3D Modeling of existing building steel structure using Autodesk Revit 2020. -??New architectural design and space distribution using AutoCAD 2020. -??3D Modeling of new design using Autodesk Revit 2020 -??Rendering of architectural model. -??4D Time analyses using MS Project. -??Simulation of time analyses in Autodesk Navisworks. |
---|---|
Relators: | Anna Osello, Davide Lorenzo Dino Aschieri |
Academic year: | 2021/22 |
Publication type: | Electronic |
Number of Pages: | 81 |
Subjects: | |
Corso di laurea: | Corso di laurea magistrale in Ingegneria Civile |
Classe di laurea: | New organization > Master science > LM-23 - CIVIL ENGINEERING |
Aziende collaboratrici: | Politecnico di Torino |
URI: | http://webthesis.biblio.polito.it/id/eprint/22981 |
Modify record (reserved for operators) |