Mahmut Koray Oskay
BIM model coordination and code checking. Paris underground station.
Rel. Anna Osello, Arianna Fonsati. Politecnico di Torino, Master of science program in Civil Engineering, 2019
|
Preview |
PDF (Tesi_di_laurea)
- Thesis
Licence: Creative Commons Attribution Non-commercial No Derivatives. Download (13MB) | Preview |
|
|
Archive (ZIP) (Documenti_allegati)
- Other
Licence: Creative Commons Attribution Non-commercial No Derivatives. Download (10MB) |
Abstract
In a constantly changing, progressive era of the world, as all the industries, construction industry is developing parallel to the world’s needs and trends. BIM or Building Information Modelling is the last step of the evolution so far. Even though BIM exists more than a decade it is still considered as new born baby. Because it is developing everyday and it is quite hard to predict the borders about where it will end up. In this thesis, the main topic is about Construction Management with BIM by using Paris underground station model. The delivery process of a project is one of the main topic of BIM.
This thesis consist the naming process of the elements, comparing and choosing the right codification system
Relators
Academic year
Publication type
Number of Pages
Course of studies
Classe di laurea
URI
![]() |
Modify record (reserved for operators) |
