polito.it
Politecnico di Torino (logo)

Short-Term Planning Model for ASML Field Factory DUV/YS Upgrades

Rosa Maria Siervo

Short-Term Planning Model for ASML Field Factory DUV/YS Upgrades.

Rel. Paolo Brandimarte. Politecnico di Torino, Corso di laurea magistrale in Ingegneria Matematica, 2017

[img]
Preview
PDF (Tesi_di_laurea) - Tesi
Licenza: Creative Commons Attribution Non-commercial No Derivatives.

Download (1MB) | Preview
Abstract:

ASML is the world’s leading provider of lithography systems for the semiconductor industry, manufacturing complex machines that are critical to the production of integrated circuits. Maintenance of ASML’s installed base is performed by the Customer Support (CS) organization and Field Factory (FF) is a growing division in CS that is responsible for performing upgrades, installs and relocations in the field. FF DUV/YS Upgrades department is interested in analyzing new possibilities for short-term planning. To achieve this, a tool for scenario analysis is needed. For the construction of a mathematical tool, a first step is the study of the mathematical complexity of the problem. Therefore, the goal of this thesis consists in the formulation of a mathematical optimization model for FF DUV/YS Upgrades manpower planning problem and in the analysis, through the development of several algorithmic approaches, of solution methods in the case of large input data.

Relatori: Paolo Brandimarte
Anno accademico: 2017/18
Tipo di pubblicazione: Elettronica
Numero di pagine: 87
Soggetti:
Corso di laurea: Corso di laurea magistrale in Ingegneria Matematica
Classe di laurea: Nuovo ordinamento > Laurea magistrale > LM-44 - MODELLISTICA MATEMATICO-FISICA PER L'INGEGNERIA
Ente in cotutela: Technische Universiteit Eindhoven (PAESI BASSI)
Aziende collaboratrici: ASML Netherlands B.V.
URI: http://webthesis.biblio.polito.it/id/eprint/9992
Modifica (riservato agli operatori) Modifica (riservato agli operatori)