polito.it
Politecnico di Torino (logo)

Thesis by Faraji Lahijani, Payam

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Item Type | No Grouping
Jump to: Thesis
Number of items: 1.

Thesis

[img] Payam Faraji Lahijani. BIM in Construction Management: Leaning the Design-Bid-Build (DBB) Project Delivery System by Using BIM in Design Phase. Rel. Anna Osello. Politecnico di Torino, Corso di laurea magistrale in Ingegneria Gestionale (Engineering And Management), 2019

This list was generated on Sun May 19 15:55:40 2024 CEST.